Preis inkl. MwSt (ohne Versandkosten)
  15,99 EUR
In den Warenkorb
Zur Wunschliste hinzufügen
Im Lager verfügbar

Kategorien

Grafik für Parkzone SV80 Servo 3-adrig: T-28 in Tower Hobbies EU
+ / - Zeiger für vergrößern/verkleinern über die Abbildung bewegen
Parkzone SV80 Servo 3-adrig: T-28
  • Übersicht
  • Technische Daten
  • Ersatzteile und Zubehör
  • Anleitungen und Hilfe

Kompatible / Passende Produkte

ParkZone Parkzone SV80 Servo 3-adrig: T-28 PKZ1081 ist kompatibel mit EFL4950, EFL4975, EFL5850, EFL5875, EFL8750, EFL8775, HBZ3100, HBZ3100EU, HBZ3100UK, HBZ3180EU, HBZ3200EU, HBZ3250, HBZ7900E, HBZ7980, PKZ1950, PKZ1975, PKZ5275, PKZ6875, PKZ6975, PKZ8175, PKZ8250, PKZ8275
Getriebetyp: Kunststoff
Groesse: Minis und Mikros

Ersatzteil Liste

4,99 EUR
Nicht vorrätig

Optionales Zubehör

3,99 EUR
Nicht vorrätig

FAQs

Produkt Informationen und Tipps

Warranty Period:

What this Warranty Covers
Horizon Hobby, Inc., (Horizon) warrants to the original purchaser that the product purchased (the "Product") will be free from defects in materials and workmanship at the date of purchase.

Limited Warranty:

What is Not Covered
This warranty is not transferable and does not cover (i) cosmetic damage, (ii) damage due to acts of God, accident, misuse, abuse, negligence, commercial use, or due to improper use, installation, operation or maintenance, (iii) modification of or to any part of the Product, (iv) attempted service by anyone other than a Horizon Hobby authorized service center, or (v) Products not purchased from an authorized Horizon dealer.

OTHER THAN THE EXPRESS WARRANTY ABOVE, HORIZON MAKES NO OTHER WARRANTY OR REPRESENTATION, AND HEREBY DISCLAIMS ANY AND ALL IMPLIED WARRANTIES, INCLUDING, WITHOUT LIMITATION, THE IMPLIED WARRANTIES OF NON-INFRINGEMENT, MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. THE PURCHASER ACKNOWLEDGES THAT THEY ALONE HAVE DETERMINED THAT THE PRODUCT WILL SUITABLY MEET THE REQUIREMENTS OF THE PURCHASER’S INTENDED USE.

Purchaser’s Remedy
Horizon’s sole obligation and purchaser’s sole and exclusive remedy shall be that Horizon will, at its option, either (i) service, or (ii) replace, any Product determined by Horizon to be defective. Horizon reserves the right to inspect any and all Product(s) involved in a warranty claim. Service or replacement decisions are at the sole discretion of Horizon. Proof of purchase is required for all warranty claims. SERVICE OR REPLACEMENT AS PROVIDED UNDER THIS WARRANTY IS THE PURCHASER’S SOLE AND EXCLUSIVE REMEDY.

Limitation of Liability
HORIZON SHALL NOT BE LIABLE FOR SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES, LOSS OF PROFITS OR PRODUCTION OR COMMERCIAL LOSS IN ANY WAY, REGARDLESS OF WHETHER SUCH CLAIM IS BASED IN CONTRACT, WARRANTY, TORT, NEGLIGENCE, STRICT LIABILITY OR ANY OTHER THEORY OF LIABILITY, EVEN IF HORIZON HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. Further, in no event shall the liability of Horizon exceed the individual price of the Product on which liability is asserted. As Horizon has no control over use, setup, final assembly, modification or misuse, no liability shall be assumed nor accepted for any resulting damage or injury. By the act of use, setup or assembly, the user accepts all resulting liability. If you as the purchaser or user are not prepared to accept the liability associated with the use of the Product, purchaser is advised to return the Product immediately in new and unused condition to the place of purchase.

Law
These terms are governed by Illinois law (without regard to conflict of law principals). This warranty gives you specific legal rights, and you may also have other rights which vary from state to state. Horizon reserves the right to change or modify this warranty at any time without notice.


WARRANTY SERVICES

Questions, Assistance, and Services
Your local hobby store and/or place of purchase cannot provide warranty support or service. Once assembly, setup or use of the Product has been started, you must contact your local distributor or Horizon directly. This will enable Horizon to better answer your questions and service you in the event that you may need any assistance. For questions or assistance, please fill out our inquiry form or call 877.504.0233 toll free to speak to a Product Support representative. You may also find information on our website at www.horizonhobby.com.

Inspection or Services
If this Product needs to be inspected or serviced, please use the Horizon Online Service Request submission process found on our website or call Horizon to obtain a Return Merchandise Authorization (RMA) number. Pack the Product securely using a shipping carton. Please note that original boxes may be included, but are not designed to withstand the rigors of shipping without additional protection. Ship via a carrier that provides tracking and insurance for lost or damaged parcels, as Horizon is not responsible for merchandise until it arrives and is accepted at our facility. An Online Service Request is available at https://www.horizonhobby.com under the Support tab. If you do not have internet access, please contact Horizon Product Support to obtain a RMA number along with instructions for submitting your product for service. When calling Horizon, you will be asked to provide your complete name, street address, email address and phone number where you can be reached during business hours. When sending product into Horizon, please include your RMA number, a list of the included items, and a brief summary of the problem. A copy of your original sales receipt must be included for warranty consideration. Be sure your name, address, and RMA number are clearly written on the outside of the shipping carton.

NOTICE: Do not ship LiPo batteries to Horizon. If you have any issue with a LiPo battery, please contact the appropriate Horizon Product Support office.

Warranty Requirements
For Warranty consideration, you must include your original sales receipt verifying the proof-of-purchase date.
Provided warranty conditions have been met, your Product will be serviced or replaced free of charge. Service or replacement decisions are at the sole discretion of Horizon.

Non-Warranty Service
Should your service not be covered by warranty service will be completed and payment will be required without notification or estimate of the expense unless the expense exceeds 50% of the retail purchase cost.
By submitting the item for service you are agreeing to payment of the service without notification. Service estimates are available upon request. You must include this request with your item submitted for service. Non-warranty service estimates will be billed a minimum of ½ hour of labor. In addition you will be billed for return freight. Horizon accepts money orders and cashiers checks, as well as Visa, MasterCard, American Express, and Discover cards. By submitting any item to Horizon for service, you are agreeing to Horizon’s Terms and Conditions found on our website https://www.horizonhobby.com/Service/Request.


United States:
Electronics and engines requiring inspection or repair should be shipped to the following address:

Horizon Service Center
4105 Fieldstone Road
Champaign, Illinois 61822

All other Products requiring warranty inspection or repair should be shipped to the following address:

Horizon Product Support
2904 Research Road
Champaign, Illinois 61822


Please call 877-504-0233 or For questions or assistance, please fill out our inquiry form with any questions or concerns regarding this product or warranty.

United Kingdom:
Electronics and engines requiring inspection or repair should be shipped to the following address:

Horizon Hobby Limited 
Units 1-4 Ployters Rd
Staple Tye
Harlow, Essex
CM18 7NS
United Kingdom

Please call +44 (0) 1279 641 097 or e-mail us at sales@horizonhobby.co.uk with any questions or concerns regarding this product or warranty.

Germany:
Electronics and engines requiring inspection or repair should be shipped to the following address:

Horizon Technischer Service
Hamburger Strasse 10
25335 Elmshorn
Germany

Please call +49 4121 46199 66 or e-mail us at
service@horizonhobby.de with any questions or concerns regarding this product or warranty.

France:
Electronics and engines requiring inspection or repair should be shipped to the following address:

Horizon Hobby SAS
14 Rue Gustave Eiffel
Zone d’Activité du Réveil Matin
91230 Montgeron

Please call +33 (0) 1 60 47 44 70 or e-mail us at
infofrance@horizonhobby.com with any questions or concerns regarding this product or warranty.

Produkt Hilfe

Produktsupport und Technischer Service

Du hast Fragen zu diesem Produkt, eine Reklamation oder benötigst Hilfe?
Bitte wende dich bei technischen Problemen an die Service Abteilung von Horizon Hobby. Für alles weitere steht dir unsere Service-Hotline gerne beratend zur Seite.
Und so erreichst du uns:

Horizon Hobby GmbH
Hanskampring 9
D-22885Barsbuettel
Deutschland/Germany

E-Mail: info[at]towerhobbies.eu

Tower Hobbies Europe Service & Tech Support:

MO-FR: 15 - 21 Uhr
Hotline: +49 (0) 40-822167899

Unsere Empfehlungen für Sie